Change of glue gas duct for Luleå Energi
Change of gas duct at Luleå Energi During the autumn, SiteConcept changed the flue gas duct and fan at Luleå Energi's pellet factory on Svartön in Luleå. The flue gas duct is made of 10mm stainless steel, and the fan is also made of stainless...
news
Flue gas cleaning projects
Design, production and delivery of flue gas cleaning systems for Rise Research SiteConcept has been honored to design, manufacture and supply a hot gas filter for another pilot project. This time to Rise Research and one of their development projects with pyrolysis and gasification. In...
Latest projects
Rebuilding of KMW-furnace and replacement of fuel feed During the summer break at Karl Hedin's sawmill in Karbenning, SiteConcept rebuilt the old KMW-furnace. The furnace has been given a larger volume and grate surface, which has increased residence time and effect. Fuel feed has been...
Relocation of SaltX pilot plant
Relocation of pilot plant from Berlin to Sweden SiteConcept built SaltX's first energy storage facility at Vattenfall's Reuter West powerplant during late 2018 and early 2019. The pilot plant was in operation for a short period after commissioning, but during that time showed excellent characteristics....
Fuel supply upgrade for Affärsverken
Replacement of fuel supply on KMW furnace SiteConcept is involved in a project for Affärsverken i Karlskrona AB and has carried out a replacement of a fuel input on a KMW Furnace. The work is carried out as a turnkey contract, including construction-related work as...
Catalytic filters
Case study regarding catalytic filters SiteConcept is collaborating with KTH and Tenmat in a case study regarding catalytic filters for cracking of tar in connection with gasification of residual biomass together with intermittently produced offgas from arc furnaces. We are working with Tenmat to develop...
Sök /Search
Liknande inlägg / Recent posts
KONTAKT / CONTACT
Drottninggatan 5, 761 45 Norrtälje
+46 70 380 23 63
info@siteconcept.se