Author: SiteConcept

Relocation of SaltX pilot plant

Relocation of pilot plant from Berlin to Sweden SiteConcept built SaltX's first energy storage facility at Vattenfall's Reuter West powerplant during late 2018 and early 2019. The pilot plant was in operation for a short period after commissioning, but during that time showed excellent characteristics....

Energy storage with SaltX in Bollmora

Pilot plant for energy storage in Bollmora SiteConcept and Sumitomo built a Pilot plant for energy storage to test fluidized bed combustion. SiteConcept designed the system with SaltX Technology  and later constructed, delivered, installed, programmed and commissioned the facility. Siteconcept was responsible for design, delivery...

Fuel supply upgrade for Affärsverken

Replacement of fuel supply on KMW furnace SiteConcept is involved in a project for Affärsverken i Karlskrona AB and has carried out a replacement of a fuel input on a KMW Furnace. The work is carried out as a turnkey contract, including construction-related work as...

Control system Seskarö

Control system replacement for solid fuel furnace SiteConcept has carried out a control system change for Stenvalls Trä for a solid fuel stove. We replaced an old Siemens S5 system and a MOG1000 from Micatrone with a modern Siemens S7 control system. The facility has...

Control system for Solör Bioenergi

Control system change for Solör Bioenergi in Nora SiteConcept has replaced an older Schneider Modicon control system for the solid fuel furnace and the flue gas condensing to a Schneider M580 control system. The existing operator system has been replaced with a new Citect system...

Control system for Raseborgs Energi, Finland

Control system change for Raseborgs Energi in Ekenäs, Finland SiteConcept has replaced two older Schneider Modicon control systems for solid fuel furnaces and water / steam to newer Schneider M580 systems. The existing Citect operating system has also been upgraded for the new control systems...

Control system for Setra Trävaror

Control system upgrade for Setra Trävaror in Nyby SiteConcept has replaced an older Schneider Modicon control system for the solid fuel furnace to a new Schneider M580 system. The existing operating system has been replaced with a new Citect system for control and monitoring.

Arbaflame Black Pellets

Siteconcept performed a feasibility study for Arbaflame black pellets "The next generation of wood pellets” In its Norwegian subsidiary, Siteconcept carried out a feasibility study for Arbaflame at their facility in Matrand, about 150 km west of Oslo. The plant was at that time a...

Pilot Plant for SaltX Technology

SiteConcept built SaltX Pilot Plant for nanocoated salt "Salt - The Green Gold of Energy Storage” Siteconcept had the honor to build the SaltX Techonology energy storage facility at Vattenfall's Reuter West thermal power plant in Berlin, Germany. The plant is a pilot plant for...